UNA GENERAL TRADING FZE, Damascus Street - Al Qusais 1 - Dubai - UAE, Office No: 04-3395394
Clean repair area of dirt, grease, oil, paint, rust, etc.
After removing the replaceable cap, press down on plunger and squeeze equal amounts onto a disposable surface and mix thoroughly.
Apply with appropriate tool in an even coat, weld bead or extruded shape as needed.
Set in 6 minutes. Cures in 4-6 hours. If temperature is below 40 degrees F, then set time is longer.
Prefer speaking with a human to filling out a form? call us and we will connect you with a team member who can help.
© Copyright by unadxb.com